GEPCO New Connection in 2024
Applying for a GEPCO new connection for your residence, business, or any other location is a simple process. You can easily apply for your GEPCO new connection by using ENC.
ENC stands for Electricity New Connection refers to an online portal system in Pakistan that allows the general public to apply for new electricity connections from various power distribution companies in the country.
This system is designed to simplify the process of obtaining a new electricity connection and to enhance transparency and accountability within the power sector.
Through the ENC system, applicants can fill out forms, track the SSGC and GEPCO status of their applications, pay fees, upload required documents, and receive customer support for any inquiries or issues related to the new connection process.
What Documents Are Required for a New Electricity Connection?
The typical documents required for the GEPCO new connection include:
- A completed application form
- A copy of your CNIC
- Proof of ownership of the property or a valid lease agreement
- NOC from local authorities if applicable
- A recent passport-size photograph
- Any other documents as specified by GEPCO at the time of application
How to Apply For GEPCO New Connection By Using ENC?
Here is the step-by-step guide on how to apply for a new electricity connection with GEPCO using the Electricity New Connection (ENC) System:
Step 1: Fill out the Online Application Form
- Visit the ENC portal and fill out the application form for a new electricity connection from GEPCO. Provide accurate information as required in the form.
Step 2: Upload Necessary Documents
- Scan and upload the required documents such as proof of ownership (like a Registry or Allotment Letter), an undertaking stating no previous electricity connection or arrears, CNIC copies of the applicant and witnesses, and any other relevant documents specific to your application type.
Step 3: Submit the Online Application Form
- After completing the form and uploading the necessary documents, submit the application form through the online portal.
Step 4: Get a Printout of the Application Form
- Once the application is submitted, make sure to get a printout of the completed application form for your records.
Step 5: Attach Documents to the Application Form
- Attach all the required documents, including the printout of the completed application form, along with the relevant attachments as specified in the instructions.
Step 6: Send the Application to the Concerned Office
- Send the completed application form along with all the attached documents to the appropriate office designated for handling GEPCO’s new connection applications.
Step 7: Submit the Demand Notice Copy
- Upon verification of the submitted documents, you will receive a demand notice. Make sure to send a copy of the paid demand notice back to the concerned office.
Step 8: Wait for Installation
- After the office verifies the payment, your new electricity connection will be scheduled for installation.
Important Considerations
- The DISCOS (Distribution Companies) have the authority to reject or cancel applications if any defaults are found.
- Ensure that all information provided is complete and accurate, as incomplete or vague applications will not be processed.
- Submitting fake documents can lead to the cancellation of your application and legal action against you.
Following the above steps will help you apply for a GEPCO New Connection by using the ENC system effectively.